Mitigating Fugitive Dust Emissions from Construction Activities in Riyadh
NCEC with the Royal Commission for Riyadh City (RCRC)
Published in the NCEC library on 19 February 2026 — Arabic/English
PDF90 pages6.3 MBArabic
Devices
Construction dust monitors and fuel vapor recovery systems, with the official NCEC requirements and downloadable copies of the guidelines and regulations.


Real-time, continuous monitoring of PM10, wind speed and wind direction on construction sites, in line with the NCEC procedures for controlling construction dust in Riyadh.

Stage I and Stage II fuel vapor recovery, and what the NCEC Environmental Guideline for Fuel Stations and the Executive Regulation for Air Quality require.
Source
Unmodified copies of the documents published in the NCEC library, each with a link to the original source.
NCEC with the Royal Commission for Riyadh City (RCRC)
Published in the NCEC library on 19 February 2026 — Arabic/English
PDF90 pages6.3 MBArabic
National Center for Environmental Compliance (NCEC)
Document code EP-2-M-05-V01
PDF42 pages1.5 MBArabic
National Center for Environmental Compliance (NCEC)
Environmental Law, Royal Decree No. M/165
PDF103 pages3.3 MBArabic
National Center for Environmental Compliance (NCEC)
English version published in the NCEC library
PDF86 pages3.1 MBEnglish
Ministry of Environment, Water and Agriculture — via the NCEC library
Scanned copy
PDF11 pages4.7 MBArabic
A summary for guidance; the binding reference is the official document issued by the authority.
Request a consultation
Tell us about your site or station and the Delta Built team will send the device datasheet and a quote, and answer your compliance questions.