FAQ
Have a question? Start here.

General
We provide integrated solutions across environmental consulting and compliance, monitoring and measurements, sustainability and climate, green buildings and infrastructure, and waste management and circular economy.
Share initial information about your project with our team, and we will help identify the relevant environmental services and requirements.
Yes. The nature of the service varies by project and stage — from planning and preliminary studies through operation, monitoring, and continuous improvement.
Select the service you are interested in and submit your project information through our contact form. Our team will follow up to understand the required scope.
Environmental Consulting & Compliance
Explore serviceAn EMP sets out how the known impacts of a lower-risk activity are managed and monitored. An EIA assesses the potential impacts of a larger project before a decision is made and proposes alternatives and mitigation. The activity's classification determines which one is required.
When applying for or renewing an operational environmental permit, when processes change or expand, and as a periodic compliance check ahead of inspections.
A description of the activity and its capacity, the site location and drawings, the project stage, and any previous permits or studies. You can attach them directly to the consultation form.
Environmental Monitoring & Measurements
Explore serviceFrequency is set by the facility's permit, the activity and its risk level. Some parameters are monitored continuously, others monthly or quarterly. We propose a programme after reviewing your conditions.
Emissions testing measures pollutants at the source, such as stacks and vents. Ambient air monitoring measures pollutant concentrations in the air around the facility that people and the environment are exposed to.
Yes. Our continuous monitoring device measures dust, fine particulates and air quality in real time and raises an alert when permitted limits are exceeded.
Sustainability & Climate Solutions
Explore serviceScope 1 is direct emissions from sources the organisation owns or controls. Scope 2 is indirect emissions from purchased electricity and energy. Scope 3 covers all other indirect emissions across the value chain.
Not in every case, but many buyers, lenders and large projects ask suppliers for sustainability data, and a structured report makes those requests far quicker to answer.
An LCA is the study that measures a product's environmental impact across its life cycle. An EPD is a standardised document that publishes those results after verification against product category rules.
Green Buildings & Sustainable Infrastructure
Explore serviceIt depends on the owner's and developer's requirements and the target market. Mostadam is designed for the Saudi context, while LEED is recognised internationally by investors and tenants. We compare both for your project before you commit.
As early as possible, ideally before concept design, because most credits depend on site, orientation and building-systems decisions.
LEED focuses on the building's environmental performance, such as energy, water and materials. WELL focuses on occupant health and wellbeing, such as air quality, light and thermal comfort.
Waste Management & Circular Economy
Explore serviceA priority order that starts with preventing waste, then reducing, reusing, recycling and recovering it, leaving final disposal as the last option.
Yes. Demolition produces large volumes and may contain hazardous materials; an assessment beforehand defines what can be recovered and how the rest is disposed of safely.
By keeping materials in use for as long as possible: less raw material is bought, transport and disposal costs fall, and some by-products become inputs for others.
Marine & Coastal Studies
Explore serviceActivities that affect the marine and coastal environment need an NCEC environmental permit, including dredging, reclamation, breakwaters, offshore platforms, coastal construction and aquaculture.
NCEC's marine EIA guide requires the marine impact and sediment footprints to be measured with numerical modelling and field data, and has an appendix on modelling requirements.
The facility prepares its own Tier 1 plan for NCEC approval, and reviews and updates it at least every two years.
Request a consultation
Request a consultation or quote for this service
Share your project details and the Delta Built team will reach out to understand your needs and agree the next step.