Continuous Monitoring Device for Construction Sites

A connected solution that monitors air quality and dust on construction sites continuously, to hold the site to its environmental conditions and protect the health of the people on it and around it.

About this service

What is continuous dust monitoring on construction sites?

Continuous monitoring means measuring particulate concentrations such as PM10 and PM2.5 around the clock with instruments installed on site, together with wind direction and speed, and sending readings in real time to a digital platform.

When readings approach the limits, instant alerts let the site act straight away (water spraying, covering stockpiles or pausing dusty work), and the data becomes a documented compliance record.

Share

Why do you need continuous dust monitoring on construction sites?

  • Riyadh's construction dust control procedures require high- and medium-risk projects to monitor dust in real time and link their monitors to the unified platform.
  • Dust is one of the most common causes of complaints around construction sites and affects the lungs of workers and residents.
  • Real-time measurement shows a problem as it happens, not days later.

What do you gain from continuous dust monitoring on construction sites?

  • Avoiding penalties, which NCEC announced can reach SAR 50,000 per requirement breached.
  • Dust control applied when it is needed instead of constant, untargeted spraying.
  • A data record that protects the project during complaints or inspections.

When you need it

For construction projects that must monitor dust in real time, including Riyadh projects of 2,000 m² or more under the National Center for Environmental Compliance procedures.

What you receive

  1. 01

    Continuous particulate and air-quality monitoring

  2. 02

    Instant alerts when limits are exceeded

  3. 03

    Documented periodic environmental performance reports

The service includes

  • Dust and fine particulate measurement
  • Real-time air quality monitoring
  • Data tracking and analysis in periodic reports
  • Alerts when permitted limits are exceeded
  • Support for environmental and regulatory compliance
  • Accurate, dependable reporting

Regulatory requirements

NCEC requirements

Reference authority

NCEC and the Royal Commission for Riyadh City

The Riyadh construction dust procedures require high- and medium-risk projects to monitor dust in real time and link their monitors to the unified platform.

Related deviceDust monitoring for construction sites
  • PM10 every two minutes, live to the RCRC/NCEC database, with wind direction, wind speed and alerts.

    Dust procedures — Section 3.11 · p. 18

  • Two or more monitors for third-category projects; one or more for second-category projects.

    Dust procedures — Section 3.11 · p. 18

  • Monitors sited, installed, tested and linked before works start, once NCEC and RCRC approve.

    Dust procedures — p. 19

  • Action level 250 µg/m³; above 340 µg/m³ for over two minutes is a violation.

    Dust procedures — Annex B · p. 82

A summary for guidance with page numbers in the official documents; the binding text is the document issued by the authority, which may be updated.

Official documents to download

Mitigating Fugitive Dust Emissions from Construction Activities in Riyadh

NCEC with the Royal Commission for Riyadh City (RCRC)

Published in the NCEC library on 19 February 2026 — Arabic/English

PDF90 pages6.3 MBArabic

Executive Regulation for Air Quality (Arabic)

National Center for Environmental Compliance (NCEC)

Environmental Law, Royal Decree No. M/165

PDF103 pages3.3 MBArabic

How we deliver it

How we deliver

  1. 1

    Programme design

    We select parameters, locations and frequency from the emission sources, sensitive receptors and permit conditions.

  2. 2

    Field measurement and sampling

    Field measurements and sampling by documented standard methods, recording the conditions of each reading.

  3. 3

    Analysis and quality control

    Sample analysis, then data review and validation before results are reported.

  4. 4

    Comparison and interpretation

    Results compared with applicable limits, with trends and sources of exceedance identified.

  5. 5

    Reporting and recommendations

    Clear periodic reports with corrective actions recommended where needed.

Request a consultation

Request a consultation or quote for this service

Share your project details and the Delta Built team will reach out to understand your needs and agree the next step.

  1. 1. Your need
  2. 2. Your project
  3. 3. Contact

Which service do you need?

Choose the service, then the scope. If you are not sure, choose “Help me choose” and a consultant will suggest the right service.

Environmental Monitoring & Measurements
Choose the scope (more than one is fine)

Scope directly covered by NCEC requirements