Skip to content
Delta Built Environmental Services & Consulting

Part of: Marine & Coastal Studies

Marine Monitoring Programmes

Periodic monitoring of water, sediment and habitats around outfalls, desalination plants, ports and marine work sites.

About this service

What is a marine monitoring programme?

A marine monitoring programme takes regular measurements of water and sediment quality and habitat condition around outfalls, desalination plants, ports and dredging sites, compared with the baseline and the standards.

During dredging in particular, turbidity is monitored in real time against alert and action levels; if readings exceed them, works are adjusted or paused before damage reaches the reefs.

Share

Why do you need a marine monitoring programme?

  • Monitoring is mandatory for desalination and treatment plants under the aqueous media regulation.
  • Marine permits include monitoring conditions during construction and operation.
  • Marine changes appear slowly and cannot be seen without regular measurement.

What do you gain from a marine monitoring programme?

  • Early warning that prevents damage instead of repairing it.
  • Adaptive management that keeps work going within safe limits.
  • Data that proves the project's compliance to regulators.

When you need it

For desalination and treatment plants discharging to sea, during dredging and coastal construction, and under permit conditions.

What you receive

  1. 01

    An agreed monitoring programme

  2. 02

    Periodic monitoring data

  3. 03

    Monitoring reports for NCEC

The service includes

  • Monitoring design and sampling locations
  • Water and sediment quality monitoring
  • Sensitive habitat monitoring
  • Comparison with applicable standards
  • Periodic monitoring reports

Regulatory requirements

NCEC requirements

Reference authority

National Center for Environmental Compliance (NCEC)

The aqueous media regulation requires monitoring at discharging facilities, and NCEC's guide sets the monitoring report content.

  • Mandatory monitoring for treatment plants above 60 m³/day, industrial treatment plants, desalination plants and injection permits.

    Aqueous Media Regulation — Art. 6, Fourth · pp. 10–11

  • Run by an approved provider; data kept at least 5 years; exceedances reported immediately.

    Aqueous Media Regulation — Art. 6, Fourth · p. 11

  • The monitoring report covers results, incidents, non-compliance and recommendations.

    Monitoring report guide — p. 8

A summary for guidance with page numbers in the official documents; the binding text is the document issued by the authority, which may be updated.

Official documents to download

Executive Regulations for the Protection of Aqueous Media from Pollution (Arabic)

National Center for Environmental Compliance (NCEC)

Environmental Law, Royal Decree No. M/165

PDF35 pages2.9 MBArabic

Guide to the environmental monitoring report

National Center for Environmental Compliance (NCEC)

Content and requirements of the periodic monitoring report — updated in the NCEC library, April 2026

PDF13 pages1.1 MBArabic

Executive Regulation for Sustainable Management of the Marine and Coastal Environment

National Center for Environmental Compliance (NCEC)

The Arabic version is available from the NCEC library

PDF30 pages1.6 MBEnglish

How we deliver it

How we deliver

  1. 1

    Scoping

    We define the activity, its area of influence, sensitive habitats and regulatory requirements.

  2. 2

    Field surveys

    We collect water, sediment, habitat and marine life data using documented methods.

  3. 3

    Modelling and analysis

    We use numerical models to predict impacts and compare them with applicable standards.

  4. 4

    Study and plans

    We prepare the study and the management, monitoring and response plans to NCEC requirements.

  5. 5

    Follow-up

    We follow the review with the authorities and run the monitoring programmes.

Request a consultation

Request a consultation or quote for this service

Share your project details and the Delta Built team will reach out to understand your needs and agree the next step.

  1. 1. Your need
  2. 2. Your project
  3. 3. Contact

Which service do you need?

Choose the service, then the scope. If you are not sure, choose “Help me choose” and a consultant will suggest the right service.

Marine & Coastal Studies
Choose the scope (more than one is fine)

Scope directly covered by NCEC requirements